@@ -40,31 +40,31 @@ Each child must:
40401 . Inspect local guidance, the module layout, and the assigned surface before
4141 editing.
42422 . Stay within the handoff; make adjacent work a new child task.
43- 3 . Open a draft PR early, push small commits, and include the required Copilot
43+ 3 . Open a draft PR early. Push small commits. Include the required Copilot
4444 co-author trailer in each commit.
45- 4 . Run the validation named in the handoff and record commands and outcomes.
46- 5 . Report the draft PR URL and target, changed and excluded files, validation,
47- decisions or risks, blockers, and follow-up work before requesting
48- integration.
45+ 4 . Run the validation named in the handoff. Record commands and outcomes.
46+ 5 . Before requesting integration, report the draft PR URL and target, changed and
47+ excluded files, validation, decisions or risks, blockers, and follow-up work.
4948
50- The parent reviews each child diff and acceptance criterion, integrates through
51- the normal PR flow, and reruns affected checks after each dependent merge. Do
52- not bypass review with a direct default-branch push or modify another session's
53- PR or issue without explicit ownership.
49+ The parent reviews each child diff and acceptance criterion. The parent
50+ integrates through the normal PR flow and reruns affected checks after each
51+ dependent merge. Do not bypass review with a direct default-branch push or
52+ modify another session's PR or issue without explicit ownership.
5453
5554Use the PSModule
5655[ validation before review] ( ../../../../../docs/content/guides/validating-before-review.md )
5756guidance and [ versioning and releases] ( ../../../../../docs/content/guides/versioning-and-releases.md )
58- for the common validation and release-readiness gates. Keep the coordinated PR
59- in draft when the integrated result is not ready .
57+ for the common validation and release-readiness gates. When the integrated
58+ result is not ready, keep the coordinated PR in draft .
6059
6160## Stop conditions
6261
63- Stop and report to the parent instead of guessing when scope, ownership,
64- acceptance evidence, branch target, release intent, or a required dependency is
65- ambiguous; when validation fails without a known owner; or when integration
66- would modify unrelated work. Do not silently expand scope, merge unreviewed
67- changes, or claim release readiness.
62+ If scope, ownership, acceptance evidence, or the branch target is ambiguous,
63+ stop and report to the parent. If release intent or a required dependency is
64+ ambiguous, stop and report to the parent. If validation fails without a known
65+ owner, stop and report to the parent. If integration would modify unrelated
66+ work, stop and report to the parent. Do not guess, silently expand scope, merge
67+ unreviewed changes, or claim release readiness.
6868
6969## References
7070
0 commit comments