Skip to content

fix(NOJIRA-123): combine the open bot dependency updates - #811

Merged
Jlougedo-TF merged 1 commit into
mainfrom
chore/NOJIRA-123_combined_dependency_updates
Nov 17, 2026
Merged

Jlougedo-TF merged 1 commit into
mainfrom
chore/NOJIRA-123_combined_dependency_updates

Conversation

@Jlougedo-TF

Copy link
Copy Markdown
Contributor

Why

Eight bot PRs were open at once, and each one needs its own CI run and review. This PR combines them so CI runs once.

What

Update From PR
next 15.4.8 → 15.5.28 in the root and demo-nextjs, with its sharp lockfile updates #810 (also covers #806, #802 and #801, which make the same next bump)
lodash-es 4.17.21 → 4.18.1 #809
fast-uri 3.1.0 → 3.1.9 #800
handlebars 4.7.8 → 4.7.10 #793
actions/checkout v7, actions/setup-node v7, actions/cache v6, actions/upload-artifact v7 #804

Each PR's diff was applied onto current main, and all of them applied cleanly. yarn install --frozen-lockfile passes on the combined lockfile. The local hooks passed: build and lint on commit, tests on push.

After merging

Close #810, #809, #806, #804, #802, #801, #800 and #793. Dependabot also closes its own PRs once it sees the versions on main.

🤖 Generated with Claude Code

One PR instead of eight, so CI runs once:

- next 15.4.8 -> 15.5.28 in the root and demo-nextjs, with sharp (#810, also
  covers #806, #802 and #801)
- lodash-es 4.17.21 -> 4.18.1 (#809)
- fast-uri 3.1.0 -> 3.1.9 (#800)
- handlebars 4.7.8 -> 4.7.10 (#793)
- actions/checkout v7, actions/setup-node v7, actions/cache v6,
  actions/upload-artifact v7 (#804)

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
@Jlougedo-TF
Jlougedo-TF requested a review from a team as a code owner November 17, 2026 10:51
@pr-auditor

pr-auditor Bot commented Nov 17, 2026

Copy link
Copy Markdown

✅ Security Analysis Results

No security issues found. 9 files reviewed.


@pr-auditor rescan to re-run · Powered by Claude Sonnet 5.5 · Docs · #security-engineering-team

@jenkins-tf

Copy link
Copy Markdown
Collaborator

[BOT] Preview available with hash e3c39e9d57f76d514a3e2eb74963cd629f9369c6 here.

@Jlougedo-TF
Jlougedo-TF merged commit 464f4ac into main Nov 17, 2026
9 checks passed
@Jlougedo-TF
Jlougedo-TF deleted the chore/NOJIRA-123_combined_dependency_updates branch November 17, 2026 12:29
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants